what does it cost to build
and operate in panamá?

move the controls. you'll see two costs: the typical building, and one built to the sustainable code. the difference is paid every month, across the whole life of the building.

// your project

describe the building.

25 % is the tropical optimum; 100 % is curtain-wall

financial assumptions

default discount 6.25 % (SBP benchmark mortgage rate); tariff escalation 3 % (ASEP adjusts every 6 months).

// construction cost

what it costs to build.

construction (hard cost)
typical building
total development cost
res v.2 (compliance)
total development cost
upfront premium
simple payback

· $/m² of construction

total includes ~15 % indirect costs: design, municipal permits, and legal.

excludes land, furniture/FF&E, and the 7 % ITBMS on professional services.

// energy cost

monthly electricity, side by side.

res v.2 — reglamento de edificación sostenible, panama’s energy-efficiency building code.

typical building
res v.2 (compliance)
air conditioninglightingplug loadsother

saved per year in operation under res v.2.

the res v.2 column applies the reductions the code targets by design; it is a regulatory goal, not measured performance.

see breakdown by end use
typical building
air conditioning
lighting
plug loads
other
res v.2 (compliance)
air conditioning
lighting
plug loads
other
// monthly operation

total monthly opex, side by side.

typical building
energy
water + sewer
maintenance (ph)
total
res v.2 (compliance)
energy
water + sewer
maintenance (ph)
total
// 30-year cost

what it costs across its useful life.

typical building
res v.2

less over the building’s life (present value), net of the upfront premium.

present value of construction plus operation over the horizon, discounted. the res v.2 column includes the upfront premium.

central figures · order-of-magnitude estimate, ±~15 % until you have a real project.

methodology and assumptions

estimate for guidance only, not a quote. figures are derived from public 2026 data (market capex, asep tariffs, idaan blocks, ph fees, res v.2 eui baselines, and microclimate data). a real project depends on site, soil, orientation, design, and market timing. for a number you can use, let’s talk.

present value of construction plus operation over the horizon, discounted. the res v.2 column includes the upfront premium.

// what is behind the numbers

the per-category averages.

every estimate starts from market averages and the energy-use baselines of the res v.2 sustainable-building code. lighting, plug loads and other are estimated per m² and do not depend on air-conditioning; only cooling varies with the a/c, the microclimate and the glazing ratio. the res v.2 column reduces each end use separately (cooling −40 %, lighting −30 %, plug −5 %) — code design intent, not measured.

residential · single-family
construction (standard)$750/m²
energy (100 % a/c)145kwh/m²·yr
water350l/person·day
occupancy2.5ppl/100 m² · max 6 per household
maintenance$0.50$/m²·mo
residential · multi-family
construction (standard)$1,300/m²
energy (100 % a/c)153kwh/m²·yr
water320l/person·day
occupancy4ppl/100 m²
maintenance$1.38$/m²·mo
office
construction (standard)$1,025/m²
energy (100 % a/c)194kwh/m²·yr
water45l/person·day
occupancy8ppl/100 m²
maintenance$2.10$/m²·mo
commercial / retail
construction (standard)$950/m²
energy (100 % a/c)280kwh/m²·yr
water75l/person·day
occupancy6ppl/100 m²
maintenance$2.40$/m²·mo
institutional
construction (standard)$1,075/m²
energy (100 % a/c)135kwh/m²·yr
water45l/person·day
occupancy12ppl/100 m²
maintenance$1.00$/m²·mo
industrial / logistics
construction (standard)$650/m²
energy (100 % a/c)210kwh/m²·yr
water50l/person·day
occupancy2ppl/100 m²
maintenance$0.70$/m²·mo
mixed-use
construction (standard)$1,250/m²
energy (100 % a/c)185kwh/m²·yr
water120l/person·day
occupancy5ppl/100 m²
maintenance$1.80$/m²·mo